Group: Forum Members
Posts: 242,
Visits: 1.2K
|
If you want to be on the safe side with a debulk you can time your work to have all of the surface layers down just before the end of the day and debulk at ambient temp over night. If you have to debulk during the day and finish the lay up the same day I would do a warm debulk at 30 to 35 degrees for 2 hours.
|