Group: Forum Members
Posts: 2,
Visits: 28
|
not too sure how much time im suppose to wait between applying tooling and coupling coat. i waited about 2 hours or until slightly firm and slightly sticky, then put the fiberglass and coupling coat. Then when everything was dried after a day or so, removed my emblem and there were imprints from the fiberglass on it. Did i not leave enough time between the coats?
|