Below details of the product;1) Sandwich panel-fabricate using carbon fiber reinforced prepreg,5HS fabric/280g/m2/180 deg curing with nomex core.
2) cure with 2 step cure cycle, dwell at 105 deg C for 30 minutes, then continue heat up at 180 deg C, stsrt 2nd dwell when reach 175deg c for 160 minutes then start cool down until 60 deg C
.Full vacuum start cure and reduce until -0.2bars when pressure reach 1.4bar.
Cure pressure 3 bars
3)Tool made from nickel
Currently, we have problem at the joggle area because the 1st and 2nd layer plies lack of contact on the mould surface which create bridging and delamination.